Projects

The people at Carmen Consulting have experience from a large number of projects in the field of resource optimization. Some examples of projects carried out by Carmen Consulting include:

  • Design and implementation of optimization methods for crew scheduling in the transportation industry.
     
  • Development and maintenance of the railway industry's most advanced on-line optimization system for distribution of freight cars at Green Cargo.
     
  • Development of the Tail Assignment system (aircraft rotations) for Aeroméxico and Carmen Systems.
     
  • Preliminary study of a Manpower Planning system for major airlines.
     
  • Analysis of ground staff operations, including the testing of a new scheduling model, and the development of a prototype scheduling system at Göteborg-Landvetter airport.
     
  • Design and implementation of an Internet based preferential bidding system.
     
  • Customization and installation of Carmen Crew Assignment with Preferential Bidding for SJ.

Clients