How does Carmen Manpower utilize information from crew planning to estimate demand?
Carmen Manpower is designed to operate as an integral part of crew planning. Carmen Manpower uses production pairings when available, to estimate the production demand. Carmen Manpower also tells crew planning how much production can be assigned to each base or crew group, how many mixed fleet type pairings that can be managed etc. Approximate pairings can also be created to support the long-term planning. Even if these pairings will never be flown, they still represent a better estimate of future demand compared with average productivity numbers for flights or aircraft.

How can I save money using Carmen Manpower?
By introducing optimization for planning of transition, courses and vacations, it is often possible to reduce head count. Other consequences can typically be better timed recruitment and better utilization of simulators.

Having access to manpower decision support tools, it is possible to implement changes faster. Close access to results and data from other optimization systems such as Carmen Crew Pairing and Carmen Crew Rostering will also provide overall cost control for the complete crew planning process.

Does the system guarantee that seniority is respected?
Seniority is the guiding principal when awarding new positions. Of course, all other company-specific rules and regulations are also checked and verified; for instance, it may be stipulated that crew members may not change position until they have worked at least 18 months at their current position.

To what extent is scenario management available?
Any number of scenarios can be managed. Long-term scenarios evaluating the effect of different fleet compositions and schedules can be explored. Shorter term scenarios exploring different sick leave or vacation scenarios are also easily created. The effect on crew availability created by different crew agreements can also be explored. Simulation capability becomes even more powerful if scenarios are explored together in Carmen Manpower, Carmen Crew Pairing and Carmen Crew Rostering.

How is feedback from the operation managed?
Operational planning changes are easy to adjust. For example, flight schedule changes or changes in crew availability may make the current manpower plan impracticable. The user can easily explore and evaluate various scenarios on how training and unassigned vacation can be moved in order to generate a feasible solution.

 

If you have any questions about the Carmen Manpower, please contact us at [email protected]